The metal worker was in and installed a railing for the loft and the stairs leading to it from the upper floor. This will probably end up being painted, as they already had primed the beam under the loft. Leaving it exposed or just a clear coat would have been a nice NYC loft kind of a look. Oh, well...
But, the tile is done downstairs. It turned out great, and though you can't really get a good idea from the photos, it is a rather large tile, the color of dirt. Quite similar to the Zara stores here in Greece.
The girls bathtub was delivered, and eventually relocated to Olivia's room upstairs, to await installation after the tiling of the girls bathroom. Below, Alex took a photo of " a meeting of the minds" and we use that term loosely. These are all the key players, contractors, architect, Takis, etc... BUT NOT ME...had I been there, perhaps the fireplace would not have been installed too far into the room, but more on that later as it is enough for its own post!